Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Hebei Shengde Jinrui Rubber and Plastic Technology Co., Ltd.

Fiberglass sign piles, gas sign piles, electric sign piles

sell
  • There is no classification
contact
  • Contact:韩经理
  • Phone:0318-2169258
search
 
link
  • There is no link yet
home > sell > Gas sign pile
Gas sign pile
products: Views:5Gas sign pile 
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-10-10 11:07
 
Details
&Gas sign pile

Sign pile, as the name suggests, is a sign device. It has been widely used in recent years. As long as there are facilities such as pipelines and pipelines buried underground, signs will be buried above. Piles are used to protect underground buried facilities and prevent pipelines from being dug out and causing unnecessary losses.
Gas sign pile model:
, Square cable sign pile model: ** () ** () ** (.) ** (.)
Round cable sign pile model: Diameter ()
, triangular cable sign pile model: **(.)**(.)**()
**()**()
Performance advantages of gas sign pile Introduction:
Material: High-strength fiberglass composite molded material (recycled and useless).
The surface text of the sign pile product is processed with special silk screen printing and concave processing, and is colored and solidified in one step. The text on the surface of the product has a hard foundation and is wear-resistant and durable. It can also be customized one by one according to the station number, mileage, path direction arrow, maintenance phone number and other information provided by the user unit.
The fiberglass gas sign pile has bright colors, anti-aging, good strength, and a service life of more than 10 years.
, FRP gas sign piles are truly maintenance-free, unlike cement, stone and other materials that need to be painted and spray-painted regularly every year, saving maintenance man-hours and expenses.
, FRP gas sign pile installation method: dig out the buried In a deep pit, two C
steel bars can be crisscrossed from front to back, left and right, and fixed with cement and stones. For circular pavement bricks, use a circular hole drill to drill holes through the road surface for pipes of the required size. The lower part is fixed with cement slurry, and the upper part is flush with the road surface.
The all-round project of FRP gas sign piles will enhance Party A’s unit’s new image of corporate standardized management. Specific sizes can be customized as required.
, Relevant technical data of fiberglass cable sign piles: , Tensile strength&, Bending strength&, Bending strength after water immersion
&, Barcol hardness&, Ring steel degree (%)&, Thermal deformation temperature& ℃, oxygen index %
Request for quotation
A total of0articles  Related Comments: